To set up electricity for a new business location in Texas, work in this order: find the ESI ID, confirm the utility (TDU) and that the address is in the competitive market, estimate usage and peak demand, choose a plan, schedule the move-in, then check the first meter read on your first bill.
Starting service at a new location is a move-in, not a switch, and that changes a few rules. This guide walks franchise owner-operators and professional offices, from law and dental practices to insurance and accounting offices, through each step, with the PUCT rules and utility tariff details behind it. The goal is simple: power on by opening day, on a plan you actually chose.
It's a move-in. Under 16 TAC §25.471, a move-in is "a request for service to a new premise where a customer of record is initially established or to an existing premise where the customer of record changes." A switch is "the process by which a person changes REPs without changing premises." Taking over a space from a previous tenant counts as a move-in, because the customer of record changes.
The difference shows up in a few places. For a switch, the provider has to offer a right to rescind "without penalty or fee of any kind for a period of three federal business days" after you receive the terms of service. 16 TAC §25.474(j) is direct about move-ins: "The right of rescission is not applicable to an applicant requesting a move-in." So read the EFL and terms of service before you submit, not after.
The same rule has providers explain on their enrollment websites that only the applicant, or the applicant's authorized agent, can make a move-in or switch request. A provider also can't charge you a fee just to enroll, though it can pass through properly tariffed TDU charges for connecting service (§25.474(n)).
Moving rather than adding a site? Your current contract is "limited to service to a customer at a location specified in the contract," and 16 TAC §25.475(c)(2)(C) bars an early termination fee for relocating when you give a forwarding address and, if your provider asks, reasonable evidence that you've left the old location.
The ESI ID, short for Electric Service Identifier, is how the Texas market identifies a specific point of service. Power to Choose describes it in its glossary as "a 17 or 22-digit number used in the deregulated market to identify a unique point of electric service delivery to a premise (your home or business)."
The fastest place to find it is an old bill for the space, because Texas billing rules require every bill to show the "service address, electric service identifier (ESI), and account number" (16 TAC §25.479). Ask the landlord or property manager for a recent bill, or for the ESI ID itself.
In a strip center, double-check the suite. Oncor's tariff (Section 6.2.3.1.2) serves multitenant buildings either through an individual meter for each tenant space or through one meter for several spaces. If your suite has its own meter, make sure the ESI ID you give the provider belongs to that meter, not the unit next door. If it shares a meter, settle with the landlord who holds the account before you enroll. If nobody has a bill, give your provider the exact service address with the suite number. The enrollment rules have the provider obtain or confirm the ESI ID when one is available.
The TDU, or transmission and distribution utility, owns the wires, reads the meter and delivers the power, whoever your retail provider is. Oncor lists four TDUs in the state's deregulated zones: Oncor, CenterPoint Energy Houston Electric, Texas-New Mexico Power (TNMP) and AEP Texas. Your TDU sets the delivery charges and move-in rules for your address, so it's worth knowing before you compare plans.
Retail choice runs through those utilities. If a city-owned utility or an electric cooperative serves the address, start with that utility, because the shopping steps in this guide may not apply there.
Your TDU wants this number before you open. Oncor's Tariff for Retail Delivery Service (Section 6.2.3.5, effective June 1, 2026) bases the initial rate for a new nonresidential premise "on projected load information provided by Retail Customer or builder/developer to ensure adequate facilities are installed." Your electrician, builder or kitchen designer can help you total the equipment list.
Two thresholds are worth planning around. First, in Oncor's area, nonresidential secondary service splits at 10 kW, and above that line most of the variable delivery charges are billed on demand in kW, based on your highest 15-minute demand of the month. CenterPoint's line is 10 kVA. The second threshold is the small commercial line, peak demand under 50 kW during any 12-month period. Below it, your EFL must show the average price at 1,500, 2,500 and 3,500 kWh a month, with a 30 percent load factor assumed if demand charges apply.
A dental, insurance or accounting office will usually look very different from a kitchen. If you're opening a restaurant, our guide to what uses the most electricity in a restaurant walks through demand billing in detail.
Your provider submits the move-in so it's processed on "the approximate scheduled date agreed to by the applicant and as allowed by the tariff" of your TDU (§25.474(k)). In other words, the TDU's tariff sets the real timing. Here's how Oncor handles it under its tariff effective June 1, 2026 (Sections 6.1.2.1 and 6.1.2.3), as read on November 3, 2026:
| Oncor move-in service | When Oncor completes it | Tariff charge |
|---|---|---|
| Move-in, existing standard meter | On the requested date, if the order arrives by 7 p.m. CT that day and the day isn't a Sunday or a holiday | $0.55 |
| Move-in, new standard meter | On the requested date, if it's a business day and the order arrives by 5 p.m. CT at least two business days ahead | $28.70 |
| Holiday move-in | On a holiday, at an existing premise with an existing meter | $25.30 |
| Priority move-in, new premise | A first-time connection made outside normal business hours | $207.90 |
Two details matter more than the dollar amounts. Neither standard move-in is available while required inspections, permits or construction are still open, and a new meter needs its own lead time. If your buildout runs late, your power-on date moves with it, so plan the move-in around your final inspection, not the day you get the keys.
Your provider can pass these TDU charges through to you (§25.474(n)). CenterPoint, AEP Texas and TNMP set their own move-in timing and charges in their tariffs, so ask your provider what applies at your address.
Pick the plan before you schedule the move-in, because the move-in is how you enroll on it. For a new location, a few things deserve extra weight:
When the contract eventually comes up, our small business electricity renewal guide explains the notices Texas requires and when to start shopping.
Opening soon? Request small business plan options
Ambit Energy is the retail electric provider, so Ambit sells the electricity and sends the bill, while your TDU connects the meter and delivers the power.
If you're signing a lease or getting close to opening, the business plan request form is the place to start. Sending it doesn't enroll you in anything. We'll reach out to talk through your options.
Have the address and your opening date? Request small business plan options
Find the ESI ID, confirm the TDU and that the address is in the competitive market, estimate your usage and peak demand, choose a business plan, then have the provider schedule the move-in for a date the TDU's tariff allows. Check the meter read dates on your first bill.
It's the 17- or 22-digit Electric Service Identifier for a point of service delivery. Texas bills have to show it, so a recent bill for the space from the landlord or the previous tenant is the quickest source. Make sure it matches your suite.
It depends on the TDU and the meter. In Oncor's area, a move-in at a space with an existing meter can happen on the requested day if the order reaches Oncor by 7 p.m. CT on any day but Sunday or a holiday, and a new meter needs at least two business days' notice. Neither standard move-in happens while required inspections, permits or construction are still open.
Yes. Starting service at a new premise, or taking over a space from another tenant, is a move-in. A switch is changing providers at the same premise. Switches come with a three-federal-business-day right to rescind, and move-ins don't.
No. A shop or office is a nonresidential premise and should be enrolled on a business product. Oncor's residential delivery schedule, for example, is limited to service "for residential purposes of a permanent nature to Individual Private Dwellings" and individually metered apartments.
Plan details and rates subject to change. Electricity service is subject to credit approval. Rule text, tariff charges and move-in timing in this article are as of November 3, 2026, from the sources linked above. Published by Ambit Energy, VIP Energy Service.